TUC Duplex Projects
DUPLEXES AND ACCESSORY DWELLING UNITS (ADU)
COMING FALL 2026: New construction on two separate lots consisting of three duplexes and two ADUs, both adjacent to campus. 18351 Halsted will have one duplex consisting of two three-bedroom two-bathroom units and two ADUs both with two bedrooms and two bathrooms. 18301 Halsted will have two duplexes with three-bedrooms and two bathrooms in each unit. The homes will be for lease to 快活林性息 faculty and staff when completed. The plans offer eye-catching curb appeal while still meeting the needs of faculty and staff. The University Corporation (TUC) is a forever owner. TUC's highest priority is owning and maintaining homes that play their part in maintaining the property values of the surrounding neighborhood.
THE PROJECTS:
Discover the next level of comfort and style in our new duplexes and ADU's!
We're excited to introduce the next phase of our innovative construction project. These new homes maintain the high standards of our previous construction at 18321 Halsted with consistent design and amenities throughout. Experience the contemporary aesthetics of modern design and color palette with a blend of neutral tones and vibrant accents, creating a welcoming and stylish atmosphere. Each home is thoughtfully designed with enhanced features-- modern amenities, energy-efficient appliances, and spacious layouts to fit your lifestyle. Enjoy the same sense of community and quality living that all residents will experience, with the same trusted features and quality we all expect.
Look forward to the perfect blend of reliable design and updated living in our latest duplex and ADU offerings!


- Issued Invitation to Bid: June 2025
- Bids Due: July 2025
- Expected Start of Construction: September 2025
- Expected Construction Completion: November 2026
Please contact Linda Turner, Associate Director, Real Estate at linda.turner@csun.edu or (818) 470-8392